Completed Projects

Loading…
  • HIGH SPEED TRAIN PROJECT BETWEEN ANKARA-ISTANBUL, PREVENTION OF LANDSLIDE AT CHAMFERS BETWEEN 2ND PHASE, TUNNEL 16–TUNNEL 17

    Ankara- Istanbul High Speed Train Project includes the construction of new dual line high speed rail line having length of 533 km. independent from the current line and suited to 250 km/hour speed completely electrical and signalled. It is targeted upon the completion of the Project that the time of travel will decrease to three […]

  • ANKARA-ISTANBUL HIGH SPEED RAIL LINE 2ND PHASE. DISPLACEMENT WORKS OF CONVENTIONAL RAIL LINES (LINE-8) BETWEEN VEZİRHAN-İNÖNÜ (SECTION-2) KARAKÖY-BOZÜYÜK STATIONS

    With the completion of Ankara-Istanbul High Speed Train Lines Project the financing of which was funded by Republic of Turkey, Treasury Warranted External Credits, there will be a rail line between Istanbul-Ankara on which speeds up to 250 km/hour can be reached. Upon the Project completion, the distance between Ankara-İstanbul will diminish to three hours.2nd […]

  • ANKARA-ISTANBUL HIGH SPEED RAILWAY PROJECT PHASE 2 BORING, REGULATION, STABILIZER, MEASURING AND WELDING WORKS OF 13.059 METERS

    The construction of second phase of Ankara-Istanbul High Speed railway, Eskişehir- Istanbul was commenced simultaneously with Ankara-Eskişehir intersection. The high speed train will decrease the time of travel between Ankara-Istanbul to 3,5 hours at first, then to 3 hours soon. Ankara-Istanbul line will provide service for approximately 7,5 million passengers. The share of railways in […]

  • ANKARA-ISTANBUL RAILWAY LINE REHABILITATION PROJECT GROUND WORKS, WORKS OF ART, VIADUCTS FILLINGS AND EARTH WORKS, MATERIAL PRODUCTION TRANSPORT, LAYING, COMPRESSION

    High Speed Railway Line between Ankara-Eskişehir is the first stage of Istanbul-Ankara High Speed Train, under the Line rehabilitation Project the construction of which started in 2003 and this first phase of the high speed train line was put the service on March 13, 2009. The line includes 25.000.000 m3 of excavation, 254 culvert buildings, […]

  • ANKARA-ISTANBUL HIGH SPEED TRAIN PROJECT, PHASE BETWEEN ESENKENT-HASANBEY, KM:407+900 AND 519+000, TRANSPORT OF 0-30 SUB-BALLAST AND 30-60 BALLAST MATERIALS FROM QUARRY TO PLATFORM, LAYING AND COMPRESSING THE SAME, TRANSPORT OF THE SAME FROM QUARRY TO ILÖREN AND YENIDOĞAN PILING FIELD (EXCLUDING BALLAST SUPPLY)

    By building the high-speed railway capable of 250 km on the track, the latest state of art technology between two largest metropolis of our country, Ankara and Istanbul, a comfortable and safe journey with travel time is aimed to be provided as reduced to 3 hours. The project in question is planned to reduce as […]

  • BAKU TBILISI CEYHAN CRUDE OIL PIPELINE PROJECT AND BLOCK VALVE STATIONS EXCAVATION, FILLING, PIPE CULVERT AND DRAINAGE PIPE INSTALLATION LOT B

    Baku-Tbilisi-Ceyhan (BTC) Pipeline which is 1.768 km long is the petroleum pipeline which carries the petroleum coming from the Sangaçal terminal near Azerbaijan-Baku and passing through Azerbaijan, Georgia, Turkey, to the Ceyhan marine terminal at the Mediterranean Sea shore. The pipeline imbedded all through the full-length of the project (total length is 1.768) and of […]

  • CARCASS BUILDING CONSTRUCTION WORKS OF ÖMER GÜLTEKİN – YAVUZ SELİM PRIMARY SCHOOL HAVING 32 CLASSROOMS

    Raising and educating people are the most difficult task in the world. We, as Tur Insaat, are happy and proud to perform our duties in achieving this difficult task as per the principles of our Corporate Social Responsibility with the investments we have made focussing on people We have contributions in construction of the schools […]

  • SUBSTRUCTURE AND SUPERSTRUCTURE CONSTRUCTION WORKS OF THE MARKET BUILDING

    The substructure and superstructure construction works of Cakmakli-Buyukcekmece Store of Metro Gross Market which is the most trusted and preferred mega store in 33 countries of the globe with 2.100 stores and 280.000 employees were successfully made by Tur Insaat. In this project, Tur Insaat Tur inşaat has successfully completed the substructure and superstructure construction […]

  • SUBSTRUCTURE AND SUPERSTRUCTURE CONSTRUCTION WORKS OF THE BUSINESS CENTRE

    The substructure and Superstructure Construction Works of EMKO CENTER which is amongst the first modern business centres in Büyükçekmece District have been completed. The project has an approximate area of 22.000 m2 approximately and it consists of a ground floor + basement floor + 3 floors. In this project, Tur Insaat Tur inşaat has successfully […]