By building the high-speed railway capable of 250
km on the track, the latest state of art technology between two largest metropolis of our country, Ankara
and Istanbul, a comfortable and safe journey with
travel time is aimed to be provided as
reduced to 3 hours.
The project in question is planned to reduce as the
travel time between Ankara and Istanbul and will
provide significant time savings in the Ankara, Eskişehir, Ankara-Afyon, Ankara and Izmir, Ankara-Konya
routes. Above mentioned Speed Train Project is a
beginning for Turkish Railways and will open a new
era in our railways.
Under the leadership of ALSIM-Alarko consortium of
the Spanish OHL, the company began to construct the
Phase I of the Ankara-Eskisehir High Speed Train line
was opened in 2009.

Business is conducted BY Tur Inşaat
Construction in this project the main contractor to
ESENKENT-Hasanbey BETWEEN KM: 407 + 900 and
519 + 000 0-30 LOWER ballast and 30-60 ballasts
MATERIAL FROM QUARRY TO platform, LAYING AND
COMPRESSING THE SAME TRANSPORT OF THE SAME
FROM QUARRY TO ILÖREN and YENIDOĞAN PILING
FIELD (EXCLUDING BALLAST SUPPLY) business is
conducted BY Tur Inşaat.